Goal 3:  Research-based Methodologies and Technology

 

ACTION PLANNING FORM

Performance Goal #3:  All teaching staff will be highly trained utilize research-based methodologies, and continue to integrate technology to maximize student achievement and success.

Action Plans

Time Line

Responsibility

Resources Needed

Evaluation

1.  Identify the research-based methodologies that we want all staff trained. 

 

2.  Create a master list indicating the staff who have been trained and those needing training.

 

 

3.  Utilize model lesson design in the evaluation packet of the Master Contract.

 

4.  Administration all trained in Instructional Leadership program

(supervision and evaluation by classroom visitations).
 

5.  Principals continue drop in visits to assist in supervision and evaluation (outside of the formal evaluation component).  Review integration of technology and student learning.

6.  Technology proficiency survey developed to determine technology growth in the classrooms
 

7.  Technology assessment created for new certified staff to the District.

 

8.  Evaluation Committee begins work in fall of 2008 to review the current evaluation of staff and provide revisions, as necessary.

 

 

Fall of 2008

 

 
 

List created in fall and begin using throughout the 2008-2009 school year
 

On-going

 

 
 

Fall of 2008-completed by spring of 2009

 

 

On-going

 

 

 

  

Spring 2009

 

 

2010

 

 
 

Fall 2008 – project completed.

Superintendent, Asst. Superintendent, Principals

 

Asst. Superintendent

 

 

 

Principals, Teachers

 

 
 

Superintendent

 

 

 

Superintendent, Principals, Asst. Principals

 

 

 

Technology Director, Principals, Asst. Superintendent

 

Technology Director, Principals, Asst. Superintendent

 

Superintendent, Board Members, Teachers, classified (as needed)

None

 

 
 

Unsure at this time

 

 

 

None

 

 
 

None

 

 

 

None

 

 

 

 

Unsure

 

 

Unsure

 

 
 

Unsure

Staff Development methods identified for all staff training.

 
 

Task completed

 

 
 

 

Lessons monitored by principal and feedback given.

 
 

All trained.

 

 

 
 

Visitation schedule turned in to Superintendent

 

 

 

Survey completed and ready for use.

 
 

Tool created and in place ready for the hiring process.

 
 

Evaluation component approved by WEA and School Board.